Electro-Mechanical works is divided into 8 packages. The details are as follows:

Electro-Mechanical Package-1 (EM-1)

Generating Units with Associated Auxiliaries and Pressure Shaft Butterfly Valve including EOT Crane


Electro-Mechanical Package-2 (EM-2)

Generator Transformers, Unit Auxiliary, Station Auxiliary, Station Service Transformers, Shunt Reactor, 17.5 kV Isolated Phase Bus Ducts, 400kV Pot Head Yard Equipment and Insulating Oil Handling & Purification System



Electro-Mechanical Package-3 (EM-3)

Design, Manufacture, Supply, Storage, Erection, Testing and Commissioning of 420 kV Gas Insulated Switchgear & Associated Equipments.


Electro-Mechanical Package-4 (EM-4)

Design, Manufacture, Supply, Storage, Erection, Testing and Commissioning of 400 kV XLPE Insulated Power Cables and Accessories


SPINNING, TESTING & COMMISSIONING 

SL. No. Main Units (Turbine) Designed Capacity in MW Commissioning Date (CoD)
1 UNIT-I, Turbine, Auxiliaries, PS, BVC & EOT 170 MW 27.12.2024
2 UNIT-II, Turbine, Auxiliaries, PS, BVC & EOT 170 MW 27.12.2024
3 UNIT-III, Turbine, Auxiliaries, PS, BVC & EOT 170 MW 01.04.2025
4 UNIT-IV, Turbine, Auxiliaries, PS, BVC & EOT 170 MW 05.06.2025
5 UNIT-V, Turbine, Auxiliaries, PS, BVC & EOT 170 MW 28.07.2025
6 UNIT-VI, Turbine, Auxiliaries, PS, BVC & EOT 170 MW Scheduled on 27.08.2025

 


Electro-Mechanical Package-5 (EM-5)

11 kV HT & 415V LT Switchgear, 220V DC Supply System and Power Cables


Electro-Mechanical Package-6 (EM-6)

Design, Manufacture, Supply, Storage, Erection, Testing and Commissioning of Protection System, Computerized Control System (CCS) and PLCC System


Electro-Mechanical Package-7 (EM-7)

Design, Manufacture, Supply, Storage, Erection, Testing and Commissioning of Air Conditioning & Ventilation System and Fire fighting System

Electro-Mechanical Package-7 A (EM-7 A)

Ventilation and Air Conditioning  System

 

Electro-Mechanical Package-7 B (EM-7 B) 

Fire protection and Detection System