[et_pb_section][et_pb_row][et_pb_column type=”4_4″][et_pb_slider admin_label=”Slider” show_arrows=”on” show_pagination=”on” auto=”off” parallax=”off” parallax_method=”off” remove_inner_shadow=”off” background_position=”bottom_center” background_size=”default” hide_content_on_mobile=”off” hide_cta_on_mobile=”off” show_image_video_mobile=”off” custom_button=”off” button_letter_spacing=”0″ button_use_icon=”default” button_icon_placement=”right” button_on_hover=”on” button_letter_spacing_hover=”0″][et_pb_slide background_image=”http://phpa2.gov.bt/wp-content/uploads/2025/08/infra-1.jpg” background_position=”default” background_size=”default” background_color=”#ffffff” alignment=”bottom” background_layout=”dark” allow_player_pause=”off” header_font_select=”default” body_font_select=”default” custom_button=”off” button_font_select=”default” button_use_icon=”default” button_icon_placement=”right” button_on_hover=”on” /][/et_pb_slider][et_pb_text admin_label=”Text and details on local contractor” background_layout=”light” text_orientation=”left” use_border_color=”off” border_color=”#ffffff” border_style=”solid” text_font_size=”16″]
Local contractors, involved in both civil and electrical works of Punatsangchhu-II Hydroelectric Project Authority
[/et_pb_text][et_pb_code admin_label=”Code 68″]
| Total No. of Local Contractors, Completed Works. | Total No. of Local Contractors, On going works. | Total |
|---|---|---|
| 88 | 0 | 88 |
[/et_pb_text][et_pb_text admin_label=”Text” background_layout=”light” text_orientation=”left” use_border_color=”off” border_color=”#ffffff” border_style=”solid” text_font_size=”16″]
I. Residential Complex
[/et_pb_text][et_pb_code admin_label=”Code 66″]
Sl.No. | Name of Work | Detail of the Work |
|---|---|---|
| 1 | Package #R-I | Construction of D-Type (2 units x 1 Block), E-Type (4units x 2 Blocks), F-Type (4 units x 6 Blocks) and allied work for PHEP-II colony) |
| 2 | Package #R-II | Construction of G-Type (6units x 8 Blocks) and allied work for PHEP-II colony |
| 3 | Package # R-III | Construction of G-Type (6 units x 5 Blocks) and H-Type (6 units x 7 Blocks) and allied work for PHEP-II colony |
| 4 | Package #R-IV | Construction of H-Type (6units x 9 Blocks) and allied work for PHEP-II colony |
| 5 | RNR Staff Quarter | Construction of Double Storey (4 units) RNR Staff quarter at Kamichu |
| 6 | Lineman Quarter | Construction of Lineman Accommodation at Dogarthang |
| 7 | Residential unit acquired from cost sharing (P-1) | Construction of B-Type (2 units), C-Type (4 units), D-Type ( 9 units), E-Type (9 units), F-Type ( 2 units), G-Type(68 units) and H-Type( 26 units) |
| 8 | Police Station | Construction of Police Station for RBP at Zhawakha. |
[/et_pb_text][et_pb_text admin_label=”Text” background_layout=”light” text_orientation=”left” use_border_color=”off” border_color=”#ffffff” border_style=”solid” text_font_size=”16″]
II. Non-residential Complex
[/et_pb_text][et_pb_code admin_label=”Code 67″]
Sl. No. | Name of the Work | Detail of the Work |
|---|---|---|
| 1. | Quality Lab | Construction of additional hall and store in the existing site office) |
| 2. | Fire station | Construction of Quality Control Lab at Dogarthang |
| 3. | Nersery | Construction of Caretaker quarter at Nursery, Bajo |
| 4. | Curing Shed | Construction of curing shed for QC wing and other Misc. works at Dogarthang complex |
| 5. | Site Office | Construction of site office project colony of PHEP-II |
| 6. | Quality Control Lab | Construction of Approach Road, Bench Development and Quality Control Lab. |
| 7. | Transit Camp | Construction of Transit Camp for E&M Workshop at Dogarthang |
| 8. | Central Store | Construction of Central Store building for E & M wing at Dogarthang |
| 9. | Security Check Post | Security Check post and Bus shed for project colony of PHPA-II at Pheytakha |
| 10. | Golden Mahseer Hatchery(P-1) | Construction of Golden Mahseer Hatchery and Conservation facility at Harachu.(P-I) |
| 11. | Fire Station | Construction of fire station with allied works for project colony of PHPA-II at Pheytakha. |
| 12. | Primary School | Construction of Primary School building for PHPA-II colony at Pheytakha |
| 13. | Club & Commercial | Construction Officers Club and Commercial Complex for Project Colony of PHPA-II at Pheytakha.(NR Package-I) |
| 14. | Golden Mahseer Hatchery(P2) | Construction of Golden Mahseer Hatchery and Conservation facility at Harachu.(P-II) |
| 15. | White Bellied Heron | White-Bellied Heron (WBH) Conservation Facility at Chanchey,Tsirang. |
| 16. | MPH | Construction of MPH, Principal’s and Caretakers Quarter for Primary School at PHPA-II colony |
| 17. | Neykhang | Construction of MPH, Principal’s and Caretakers Quarter for Primary School at PHPA-II colony |
| 18. | Statues | Sculpture of various statues for Neykhang at Kamichhu |
| 19. | Statues | Sculpture of various statues for Neykhang at Kamichhu |
| 20. | Depri | Mural Painting(Depri),Gold Gilding of Statue faces and Bhutanese painting on Timber structure for Neykhang at Kamichhu |
[/et_pb_text][et_pb_text admin_label=”Roads and Bridges” background_layout=”light” text_orientation=”left” use_border_color=”off” border_color=”#ffffff” border_style=”solid” text_font_size=”16″]
III. ROADS AND BRIDGES
[/et_pb_text][et_pb_code admin_label=”Code 67″]
Sl. No. | Name of the Work | Detail of the Work |
|---|---|---|
| 1. | Bailley Bridge | Construction of bridge for project colony |
| 2. | Road | Strengthening and recarpeting of Wangdue-Taksha highway from RD 23.90 km to RD 29.40 km(Package I) |
| 3. | Road | Strengthening and recarpeting of Wangdue-Taksha highway from RD 29.40 km to RD 35.00 km (Package II) |
| 4. | Colony Road | Construction of approach road on upstream side (1000m) in Project Colony of PHEP-II at Pheytakha |
| 5. | Crash Barrier | Metal Crash Barriers along Wangdue-Taksha PNH from RD 24.4km to RD 35.00 km |
| 6. | Road Maintenance | Routine maintenance of Road |
| 7. | Nursery Road | Maintenance of Existing Approach road to Project Nursery |
| 8. | Black topping of colony internal road | Construction of black topping of colony internal roads and other allied works for PHPA-II at Pheytakha(M/s Lotus const.) |
| 9. | Open surface box drain | Construction of Open Surface Box Drain and Boulder Trap from ch.35.15km to ch.35.5km |
| 10. | Black topping of flood affected | Re-alignment and black topping of (flood affected PNH stretch,Phelreychu) and other allied works |






